Estación Integral - Km 11
Ruta Nacional Mariscal Estigarribia, Ciudad del Este, Alto Paraná, 100122
Estación Integral - Km 11 is an electric-vehicle charging station located at Ruta Nacional Mariscal Estigarribia, Ciudad del Este, Alto Paraná, 100122. It provides 2 charge points, 2 connectors and up to 100 kW.
Charging details
- Maximum power
- 100 kW
- Charge points
- 2
- Connectors
- 2
- Country
- Paraguay
- Last verified
- 10 Jul 2023
Data source: Open Charge Map. Source status last updated 10 Jul 2023. PlugSphere page updated 13 Jul 2026. Imported reference data; check the operator before travelling.
Solicitar la Tarjeta de liberación con los playeros
Connectors
- Connector 100 kW × 2
Driver reviews
Sign in to rate this station and join the discussion.
No reviews yet — be the first to rate it.