Acciona - Mesón Las Tres Chimeneas
Carretera Zamora, km 54, Fermoselle, Zamora, 49230
Acciona - Mesón Las Tres Chimeneas is an electric-vehicle charging station located at Carretera Zamora, km 54, Fermoselle, Zamora, 49230. It provides 1 charge point, 3 connectors and up to 50 kW.
Charging details
- Maximum power
- 50 kW
- Charge points
- 1
- Connectors
- 3
- Usage cost
- 0,43€/kWh DC - 0,36€/kWh AC
- Country
- Spain
- Last verified
- 10 Aug 2024
Data source: Open Charge Map. Source status last updated 10 Aug 2024. PlugSphere page updated 13 Jul 2026. Imported reference data; check the operator before travelling.
Connectors
- Connector 50 kW × 1
- Connector 50 kW × 1
- Connector 22 kW × 1
Driver reviews
Sign in to rate this station and join the discussion.
No reviews yet — be the first to rate it.