PLN ULP Daya
Jl Batara Bira, Makassar, Sulawesi Selatan, 90615
PLN ULP Daya is an electric-vehicle charging station located at Jl Batara Bira, Makassar, Sulawesi Selatan, 90615. It provides 1 charge point, 2 connectors and up to 180 kW.
Charging details
- Maximum power
- 180 kW
- Charge points
- 1
- Connectors
- 2
- Country
- Indonesia
- Last verified
- 26 Mar 2026
Data source: Open Charge Map. Source status last updated 26 Mar 2026. PlugSphere page updated 13 Jul 2026. Imported reference data; check the operator before travelling.
Connectors
- Connector 180 kW ร 2
Driver reviews
Sign in to rate this station and join the discussion.
No reviews yet โ be the first to rate it.